Test-Firing of Rocket Put Off by Malfunction
- Share via
BRIGHAM CITY, Utah — A full-scale test-firing of a redesigned space shuttle booster was scrubbed Saturday in the countdown’s last second when the rocket’s ignition system failed, officials said.
A decision on rescheduling the test, considered a crucial milestone in the resumption of manned U.S. space flights, was to be made today, said Allan McDonald, Morton Thiokol Inc. vice president for shuttle engineering.
The earliest a new test could be conducted would be Monday afternoon, he said.
A “safe and arm” device in the rocket’s ignition system halted the countdown, McDonald said. Either the device, which is part of the booster, failed or the fire-control circuit feeding it information malfunctioned, he said.
Device Will Be Studied
McDonald said engineers would have to examine the device before determining the exact cause.
Earlier, the test-firing was delayed twice.
A computer caused a two-hour wait when it malfunctioned during the last in a series of dry-run countdowns, said John Thirkill, vice president for space operations at Morton Thiokol, which builds the booster.
A second delay occurred when a spot of frozen fuel was found inside a fitting in a system that rotates the nozzle at the base of the rocket during firing.
The 126-foot-long rocket was to be fired for two minutes in a horizontal position at Morton Thiokol’s test area, about 25 miles west of Brigham City. The first full-scale test of the redesigned rocket was conducted Aug. 30 and declared a success.
More to Read
Sign up for Essential California
The most important California stories and recommendations in your inbox every morning.
You may occasionally receive promotional content from the Los Angeles Times.